Connect the rails
Power the sensor and controller and connect their grounds.
Build a basic DHT22 circuit with labeled pins, component values and connection guidance.
Four leads, one pullup and a voltage-compatible controller.
Follow the component values and pin connections
Power the sensor and controller and connect their grounds.
Use the pullup instead of actively driving the bus HIGH.
Update the display only after a complete frame with the correct checksum.