I timed an operator doing a manual packing task with a stopwatch: ten cycles with a mean of 0.80 minutes and a standard deviation of 0.08 minutes. I judged the operator to be working a bit faster than normal pace, around 110 percent, and the company uses a 15 percent allowance.
How do I turn this into a standard time and an expected output per shift, and were ten cycles enough to trust the result?