I have to balance a manual assembly line for a course project. The shift is 8 hours with 30 minutes of breaks, the required output is 300 units per shift, and the product needs eleven tasks that add up to 400 seconds of work, the longest single task being 70 seconds.
How do I get from these figures to the number of workstations, how is the efficiency of the balance calculated, and what is the difference between takt time and cycle time?